Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

AIC Exam Study Guide 2023: Construction Management and Engineering, Exams of Nursing

Comprehensive study guide for the AIC exam in 2023, covering construction management and engineering topics. Includes questions on effective listening, subcontractor change orders, job diaries, communication methods, concrete and soil types, calculations, contracts, forming a corporation, financial ratios, safety violations, lean construction, ethics, law principles, electrical and plumbing requirements, structural steel, bid documents, specifications, work breakdown structure, contractor payments, damages, fall protection, ladders, scaffolds, noise levels, surveying equipment, rectangles, procurement process, submittals, permits, and contract completion.

Typology: Exams

2023/2024

Available from 05/07/2024

2024ExamGuru
2024ExamGuru 🇺🇸

735 documents

1 / 16

Toggle sidebar

Related documents


Partial preview of the text

Download AIC Exam Study Guide 2023: Construction Management and Engineering and more Exams Nursing in PDF only on Docsity! AIC Exam Study Guide Questions And Answers 2023. What percentage of conversations do listeners remember of what they hear? - Answer 10% What percentage of conversations do speakers remember of what they say and do? - Answer 90% When giving presentations, people should do which of the following? - Answer Keep the conversation short and on topic Which of the following should people do to effectively listen? - Answer Listen objectively with the intent to understand the speaker's perspective Which of the following statements is true about texting and a subcontractor change order? - Answer Texting your subcontractor that a change order is coming later in the day is a good practice What does RFI stand for? - Answer Request for Information An Owner-initiated change order should include which of the following? - Answer Reference to contract documents describing the change in detail A job Diary should be maintained by who? - Answer All members of the project management team If a job has more than one shift, how often should a daily report be completed? - Answer Each shift Daily reports are primarily created by whom? - Answer Superintendents Meeting AGENDAS should be distributed __________ - Answer At least one day PRIOR to the meeting Meeting MINUTES should be distributed _______ - Answer About one day AFTER the meeting Which of the following types of meetings is typically held at regular weekly or biweekly intervals throughout the project? - Answer Progress Meetings Which of the following documents is used for correspondence between the architect or owner and the contractor? - Answer Formal Business Letter Which of the following documents is used for correspondence between the home office and job site? - Answer Memorandum What is the best time to distribute the working agenda to the participants of a meeting? - Answer About one day prior to the meeting AIC Exam Study Guide Questions And Answers 2023. Which document describes the suggested agenda for the preconstruction meeting? - Answer General Requirements What is the best time to distribute the meeting minutes to the participants? - Answer About one day after the meeting Which of the following descriptions are the primary content items for the meeting minutes? - Answer Attendance, Topical Headings, Brief notes on what was discussed in paragraph form, who is assigned to action items, completion status Which of the following statements is true about the use of texting as a means of communicating in the construction industry? - Answer Appropriate for clarifying but not for formal direction What is the best way for a contractor to get formal clarification on an apparent discrepancy found in the plans? - Answer RFI What are the leadership skills needed to conduct a productive meeting? - Answer Listening attentively, responding constructively, soliciting all ideas, and matching decision making to the situation Which of the following is not commonly discussed at monthly owner / architect / contractor progress meetings? - Answer Pending subcontractor change orders What is a listener's retention percentage of an oral conversation? - Answer 10% Which of the following communication methods is the most effective in knowing that the communication has been understood? - Answer The sender should ask open- ended questions and make them speak. Which of the following is the best example of an open-ended question? - Answer What steps are you going to take to complete the activity? Which material is prone to fire damage and deterioration by moisture and insects? - Answer Wood Concrete is strongest in __________ - Answer Compressive Strength Which of the following is a type of aggregate? - Answer Gravel Approximately what percentage (by volume) does aggregate make up in general- purpose concrete? - Answer 75% What does a sieve size of No. 4 mean? - Answer The sieve has four openings per linear inch. Which panel wood product is made up of thin layers of wood veneers adhered together in alternating directions? - Answer Plywood AIC Exam Study Guide Questions And Answers 2023. What is the enthalpy of 1lb of air given a dry bulb temperature of 75*F and a relative humidity of 50%? [75*F on horizontal axis, follow that up to 50% on curved axis, use diagonal line at intersection to determine enthalpy] - Answer 28 BTUs Which of the following is a fundamental element of a contract? - Answer Mutual Acceptance Which of the following contract types is generally considered to have the most risk for the contractor? - Answer Lump Sum Which of the following contract types is best used if the scope is well defined but not the quantities of material? - Answer Unit Price In which delivery method is the construction administrator most like a consultant? - Answer CM Agency Which statement is true about the design-build delivery method from the owner's perspective? - Answer There is a single source of fault for building system failures Which delivery method has the most risk for the contractor? - Answer Design-build Which of the following is a major difference between a CM Agency and a CM at risk? - Answer Caps the construction costs the owner is required to pay Under which legal structure are the least total taxes paid for the goods and services provided by the company? - Answer Sole Proprietorship In the construction industry, which legal entity is often a temporary arrangement? - Answer Joint Venture Which is an advantage of forming a corporation? - Answer Shareholders have reduced personal liability A company has $10,000 in cash, $20,000 in equipment, and $20,000 in accounts payable. The tax rate is 13%. What is the current ratio? [=Current Assests/ Current Liabilities] - Answer =$10,000 / $20,000 = 0.5 What is the return on assets assuming a net profit before tax of $15,000 and $30,000 total assets? [(Net Profit before taxes / Total Assets) x 100] - Answer = ($15k / $30k) x 100 = 50% A company has $50,000 in equipment, $20,000 in cash, and $30,000 in accounts payable. How much working capital does it have? [Current Assets - Current Liabilities] - Answer = $20k - $30k = -$10k Which chart would be the most appropriate to show the percentage of fall protection safety violations compared to all safety violations? - Answer Pie Chart AIC Exam Study Guide Questions And Answers 2023. Which of the following is a management system used to improve customer satisfaction? - Answer TQM, Six Sigma, Lean ((All of the above)) Which management system was developed based on Toyota's Production System? - Answer Lean Which of the following should a construction professional provide when delivering services to his or her clients based on the AIC code of ethics? - Answer Management Excellence The owner wants to fast-track a construction project. Which project delivery system best supports this process? - Answer Design-Build A contract is entered into in which the design and scope are undefined and owner agrees to pay for all direct labor, materials, equipment, plus an agreed upon fee to the contractor for their services. What is this type of contract called? - Answer Cost Plus A contract is entered into in which the owner holds a contract with the architect and each trade contractor. In addition, the owner holds a contract with a management service company to perform the trade coordination, cost control, and scheduling services. What is this project delivery method called? - Answer Construction Management Which legal entity is considered perpetual (never ending)? - Answer Corporation Under which municipal law are corporations formed? - Answer State Which law establishes basic rules governing the sale of goods used to establish a purchase order? - Answer Uniform Commercial Code Which graphical measurement tool is a bar chart that displays a frequency distribution? - Answer Histogram Which of the following principles of law states that if the prime contractor reasonably relies on the promise or price of the subcontractor to its detriment, then the subcontractor must be held to its promise to avoid harm to the prime contractor even though a signed contract between the contractor and subcontractor does not exist at the bidding phase of a project? - Answer Promissory Estoppel At which point in time must the owner-contractor agreement be provided to each prospective subcontractor bidder? - Answer During the bidding phase of the project What is the working capital of a company that has $1,415,815 in assets and $682,661 in liabilities? [=Current Assets - Current Liabilities] - Answer =$733,154 What is the current ratio of a company that has $1,415,815 in assets and $682,661 in liabilities? [=Current Assets / Current Liabilities] - Answer =2.07 AIC Exam Study Guide Questions And Answers 2023. If a company has $260,631 in cash, $423,731 in contracts receivable, and $682,661 in liabilities, what is its quick ratio (acid test)? [= (Cash and Equivalents + Accounts Receivable)/ Current Liabilities] - Answer = (260,631+423,731)/682,661 = 1.00 Which of the following is not a type of pile installed by pile driving? - Answer Cast-in- place concrete pile Which of the following types of equipment is most suitable for excavation of a standard residential basement? - Answer Excavator Which of the following types of excavation equipment is most suitable for removing and stockpiling on-site 2ft of soil from 1 acre of excavation area? - Answer Scraper Which of the following types of excavation equipment is most suitable for final grading of a roadway? - Answer Grader Which of the following types of compaction equipment is most suitable for compacting the granular base of a large parking lot? - Answer Smooth wheel roller A sheepsfoot roller is most suitable for compaction of which type of soil? - Answer Clay Soils What is an advantage of a tower crane? - Answer Its operator has an unobstructed view of the site. Which of the following types of aerial work platforms is most suitable for installing fire sprinkler piping inside a building? - Answer Slab Scissor Lift Using a crane loading diagram, what is the maximum load of a crane if the boom is at an angle of 40* and extended 53ft? [Using the chart, first find the length of boom, then scroll down to find the angle that its at] - Answer 5030lb In which CSI division is information about Specialties located? - Answer Division 10 Which CSI technical specification part would contain information about which submittals were required? - Answer Part 1 Which CSI division significantly changed with the 2004, 50-division format change? - Answer Division 15 Which of the following views is used in plumbing drawings to show a 3D view of pipe runs? - Answer Isometric Where is the best location to look to determine the electrical requirements for a project's chillers? - Answer Schedule AIC Exam Study Guide Questions And Answers 2023. Using the following bond premium schedule below, what is the bond premium for a $2,755,000 project? First $5k= $12/$1000 Next $2M= $6k + $7.25/1000 Next $2.5M= $20.5K + $5.75/1000 - Answer =(($12 x ($5k/$1k)) + (6k + (7.25 x (2M/1000)) + (20.5K + (5.75 x (750K/1000) = $45,373 What does the R.S. Mean's unit of measure abbreviation for MBF stand for? - Answer 1,000 Board Feet If there is a crew of: 1 Foreman 4 Pile Drivers 2 Crane Operators .5 Oilers on any given 8hr work day, how many total work hours are expended? - Answer =(1 x 8) + (4 x 8) + (2 x 8) + (.5 x 8) = 60 hours Considering a crew works 60 total hours a day, and has a daily output of 545 SFCA, what is their productivity rate in work hours per unit? - Answer = 60 / 545 = 0.110 Given a rectangular cofferdam that is 60ft wide x 100ft long x 10ft deep and enclosed with a 3ft toe, how many total SFCA are required for the sheet piling? - Answer = (60 x 10 x 2sides) + (100 x 10 x 2sides) + (3 x 60 x 2sides) + (3 x 100 x 2sides) = 4160SFCA Which of the following statements is true about a company's cost code structure? - Answer It is often organized by CSI division with adaptations by individualized companies Which of the following statements is true about the work breakdown structure? - Answer Divides the work into manageable packages A work breakdown structure typically includes which of the following for each work package? - Answer Budgeted cost of work scheduled When are commercial contractors typically paid by the owner? - Answer Monthly Which statement is true about front end loading a schedule of values? - Answer Increases the value of activities at the beginning of a project in the schedule of values to improve the contractor's cash flow Which of the following statements is true about liquidated damages? - Answer Determined at the time of contract signing based on estimated owner losses AIC Exam Study Guide Questions And Answers 2023. A Gant chart is which type of scheduling tool? - Answer A Bar chart If activity "C" finishes before activity "E", with activity "E" immediately following activity "C", what relationship do these activities share? - Answer Finish to Start What type of relationship would best describe "installing the scratch coat of stucco" and then "installing the top coat of stucco"? - Answer Finish to Start What classification of activity would "shop drawing rejection" be? - Answer Procurement Which classification of activity would "building programming" be? - Answer Design Which of the following defines the term 'trade stacking'? - Answer The loss of productivity by placing too many workers in too small a space Which statement is true about the critical path? - Answer The longest string of activities through the schedule How is 'Free Float' Defined? - Answer The amount of slack between activities Which types of activities are considered first when compressing the length of a project? - Answer Zero Float and least cost to compress How is the term 'fast tracking' defined in construction? - Answer Overlapping execution of the design, procurement, and construction What is the name of the term for shifting the activities within their available free floats to produce a uniform workforce and reduce the maximum resource usage requirements? - Answer Resource Leveling What is the best source for developing the list of activities for the logic network and schedule? - Answer Technical Specifications How is total float defined? - Answer How much a series of activities can be delayed without delaying a project What is the primary reason the courts disfavor bar chart schedules? - Answer They do not show the interrelationship of activities or the float within activities When was the Occupational Safety and Health Act passed? - Answer 1970 Which of the following parts of the CFR Title 29 addresses safety and health regulations for construction? - Answer 1926 How many employees must an employer have before OSHA record keeping is required? - Answer 10 or more AIC Exam Study Guide Questions And Answers 2023. Which of the following forms is used to record the information of a single specific incident? - Answer Form 301 How long must the OSHA Form 300 be kept by the employer? - Answer 5 years Within how many days must a notice of contest be filed for an OSHA citation? - Answer 15 Days Which of the following accidents makes up the majority of fatalities in the construction industry? - Answer Falls What size load must a personal fall arrest system be designed to? - Answer minimum 5,000 lb per person Which of the following heights would be acceptable for the top rail of a guardrail system? - Answer 45in Which of the following ratios of vertical rise to horizontal run is acceptable for an extension ladder supported against a building? - Answer 4:1 What is the maximum horizontal travel distance that a portable fire extinguisher can be located on a job site? - Answer 100ft What is the farthest away that an egress ladder can be located from a worker in a trench excavation greater than 4ft in depth? - Answer 25ft Which of the following ratios of vertical rise to horizontal run is acceptable for a supported scaffold that is not braced or tied back to a structure? - Answer 4:1 What is the minimum load that a suspension scaffold must be designed to? - Answer Four times the intended load What is the average noise level for which hearing protection is required to be worn? - Answer 85 dB The Safety Standards utilize the abbreviation 29 CFR Part 1926. What does the acronym CFR stand for? - Answer Code of Federal Regulations Which part of OSHA Standards is designated for record keeping? - Answer 1904 According to OSHA, which document must the supervisor complete immediately after an accident by describing the accident in detail? - Answer OSHA's Injury and Illness Incident Report (Form 301) When and where must a project's OSHA Summary of Work-Related Injuries and Illnesses (Form 300A) be posted? - Answer February 11 - April 30 and accessible to all employees at the job site AIC Exam Study Guide Questions And Answers 2023. Which of the following is a term used to describe minor incomplete or deficient items that need to be completed before final acceptance of a building? - Answer punch list What is the most common green building rating system in the United States for commercial buildings? - Answer LEED Which of the following is the initial LEED credential available to individuals? - Answer LEED Green Associate Which of the following items are never included with a purchase order? - Answer Labor The terms on a purchase order indicate FOB Factory. At which point does the responsibility for the goods change? - Answer Passes at time of pickup by the carrier Which of the following descriptions defines the term 2/ 10 Net 30? - Answer If paid within 10 days of the invoice date, a 2% discount can be deducted; full payment is due in 30 days. Which position typically writes the subcontract agreements? - Answer Project Manager Which of the following activities does a millwright perform? - Answer Assembles and aligns rotating equipment Which party typically obtains the general building permit? - Answer Contractor Which form is filled out by the employees to inform the employer how much money is to be withheld from their paychecks for taxes? - Answer W-4 Which of the following posters describes the regulations for wage payment and hours of work for all industries and must be posted at the job site? - Answer Fair Labor Standards What is the name of the act that requires the contractor to pay prevailing wage rates on all federally funded projects? - Answer Davis-Bacon Act Which document is signed in agreement by the owner, architect, and contractor and modifies the contract's terms and AIC Exam Study Guide Questions And Answers 2023. conditions? - Answer contract change order Which document establishes the actual start date from which the beginning of the project is calculated? - Answer notice to proceed Which of the following parties issues the certificate of occupancy? - Answer fire marshal, mechanical inspector, electrical inspector, and building inspector Which of the following descriptions provides the best example of how to report progress on the job site? - Answer Poured 75 cy concrete, placed rebar, and stripped forms for columns D1-D4. Which party is typically the developer of the shop drawings? - Answer subcontractors and vendors Which document explicitly tells the reader the specific shop drawings, product data, and reference standards required on a project? - Answer in part 1 of each section of a technical specification division
Docsity logo



Copyright © 2024 Ladybird Srl - Via Leonardo da Vinci 16, 10126, Torino, Italy - VAT 10816460017 - All rights reserved