Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Project Management Assignment 3: Notice to Proceed, Partnering Charter, Job Site Plan - Pr, Assignments of Project Management

Assignment 3 for cm421 project management i, due on january 24, 2008. The assignment includes creating a notice to proceed with five essential elements, developing a partnering charter with a communication plan, issue resolution plan, and evaluation plan, and designing a detailed job site plan for the northwest technology center project. The job site plan should include locations for material storage and truck traffic flow, mobile crane setup locations, contractor trailers, break areas, entrance gates, and temporary sentiment and storm water control. Daily reports for a general contractor should collect important information such as labor hours, equipment hours, material usage, safety incidents, and weather conditions.

Typology: Assignments

Pre 2010

Uploaded on 03/10/2009

koofers-user-kf0
koofers-user-kf0 🇺🇸

10 documents

1 / 1

Toggle sidebar

Related documents


Partial preview of the text

Download Project Management Assignment 3: Notice to Proceed, Partnering Charter, Job Site Plan - Pr and more Assignments Project Management in PDF only on Docsity! CM421 Project Management I Assignment 3 – Due Jan 24, 2008 10. Notice to Proceed – List 5 essential elements of a general contractor / owner notice to proceed 11. Partnering Charter (page 84 in text) – This assignment should have two parts. 1) hand-written in-class worksheet, 2) Based on the class exercise, create a formal Partnering Charter and plan documents (page 7-7 in text). Include Charter language, Communication Plan, Issue Resolution Plan, and Evaluation Plan. 12. Job Site Plan – Create a detailed job site plan (see Figure 10-2 in text) for the Northwest Technology Center project. This job site plan will be used by your superintendents and subcontractors to plan their work. List ten (10) items of primary interest to superintendents and foremen on this project. Show the following on your site plan: a. Location where you plan to receive and store materials. b. Truck traffic flow for loading and unloading c. Mobile crane setup locations and swing radii d. Contractor management trailer e. Contractor supply trailer f. Subcontractor trailers g. Break areas h. Entrance gate(s) i. Temporary Sentiment and storm water control 13. Daily Reports - What information is important to collect in a general contractor daily report? (include 5 items) 1
Docsity logo



Copyright © 2024 Ladybird Srl - Via Leonardo da Vinci 16, 10126, Torino, Italy - VAT 10816460017 - All rights reserved