Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Causes of In-adequate Project Formulation-Project Management-Lecture Slides, Slides of Project Management

This lecture is part of lecture series on subject of Project Management at Tezpur University Gate. Instructor name is Rajkumari Vishaka. It includes: Causes, Project, Formulation, Superficial, Field, Investigations, Flawed, Judgments, Tools, Bar, Charts, Network, Techniques

Typology: Slides

2011/2012

Uploaded on 07/11/2012

devpad
devpad 🇮🇳

4.1

(54)

80 documents

1 / 10

Toggle sidebar

Related documents


Partial preview of the text

Download Causes of In-adequate Project Formulation-Project Management-Lecture Slides and more Slides Project Management in PDF only on Docsity! Causes of In-adequate Project Formulation • Superficial and/or unrealistic field investigations • Cursory assessment of input requirements • Slip-shod methods used for estimating costs/benefits • Omission of project linkages • Flawed judgments due to lack of expertise • Undue hurry to get started • Deliberate over-estimation of benefits and under- estimation of costs Docsity.com Tools of Project Planning • Bar Charts/ Gantt Charts/Multiple Activity Chart • Network Techniques • Hierarchy of Plans Docsity.com Diverse Applications of PERT & CPM • Launching a spaceship • Construction of an industrial plant • Building a large housing project • Overhauling of an organization • Research and development program • Manpower training program • Starting a new venture • Adult literacy program Docsity.com PERT, CPM and Network Cost System • Development of project network • Time estimation • Determination of critical path • Scheduling when resources are limited • PERT Model • CPM Model • Network Cost System Docsity.com Rules for Network Construction • Arrow as an activity • Node as an event and having a distinct number • Activity denoted by preceding and succeeding event • No loops in project network • No more than one activity can have the same preceding and succeeding events • A dummy activity is an imaginary activity with zero time and resource use • Dummy activity is used to show logical flow or a constraint and to smooth out network construction Docsity.com
Docsity logo



Copyright © 2024 Ladybird Srl - Via Leonardo da Vinci 16, 10126, Torino, Italy - VAT 10816460017 - All rights reserved