Safety Management and Construction Risks: A Comprehensive Guide, Exams of Marketing Business-to-business (B2B)

A detailed overview of the primary components of an effective safety management plan in the construction industry. It covers the causes of injuries, personal protection equipment, safety standards enforcement agencies, and more. Additionally, it discusses construction risks, risk factors, contingencies, and various strategies to optimize energy use, reduce waste, and minimize environmental impact. The document also touches upon green materials, leed certification, and visualization skills required in the construction industry.

Typology: Exams

2023/2024

Available from 05/21/2024

advance-tech
advance-tech 🇺🇸

609 documents

1 / 10

Toggle sidebar

Related documents


Partial preview of the text

Download Safety Management and Construction Risks: A Comprehensive Guide and more Exams Marketing Business-to-business (B2B) in PDF only on Docsity! Cooke's Cumulative COSC 153 FINAL Exam Questions with Verified Solutions. What are the fundamental objectives of a quality management plan? - Correct answer Do it right the first time, Mistake Prevention, and Continuous Improvement Quality Control is the ____________ that ensures the quality required by the plans and specifications. - Correct answer PROGRAM Quality Assurance is the __________ that achieve the quality required by the plans and specifications. - Correct answer PROCESS Quality Control addresses at the project level and deals with __________ to the plans and specifications. - Correct answer CONFORMANCE Quality Assurance addresses quality at the _____ level and deals policies and procedures. - Correct answer PROCESS Identify the primary components of an effective safety management plan. - Correct answer Management Commitment, Job site analysis, Hazard Prevention and control, and Safety & Health training What are the primary causes of injuries in the construction industry? - Correct answer falls, Struck by an object, Crushed or trapped, and Electrical shock What is the name of the agency responsible for establishing safety standards and enforcing them through inspections conducted at construction job sites? - Correct answer The Occupational Safety and Health Administration, commonly referred to as OSHA Identify at least five items of personal protection equipment that might be utilized by workers on the job site. - Correct answer hard hats, Safety glasses, Steel-toed shoes or boots, Face shields, Ear plugs, Special suits or coveralls, Respirators, Gloves, and Safety harnesses What is an MSDS? - Correct answer An MSDS, or material safety data sheet, must be obtained and maintained for every chemical product that is located on the job site. Each sheet contains information regarding chemical data and composition, fire and explosive hazard data, physical data such as appearance, odor, or evaporation rate, and handling and storage information Name at least three types of construction risks. - Correct answer Labor availability, Quality of labor pool, Differing site conditions, Site access, Property damage and theft, Coordination of utilities, Adverse weather, Labor disputes, Safety, and Material availability Name the six different categories that most risk factors generally fall under. - Correct answer Rebid risks, Design risks, Construction risks, Political/legal/regulatory risks, Financing risks, and Environmental risks What is a contingency? - Correct answer an amount of money added to an estimate to cover unknown conditions or risk impacts A contingency is a % added to the estimate. - Correct answer TRUE What is a latent design defect? - Correct answer Flaw in design, Flaw that shows itself, Not known until after construction, and Time has passed What factors must be considered when trying to determine the risk rating for any given risk? - Correct answer Probability that risk will occur, Impact if it does Name the five most common risk mitigation strategies. - Correct answer Avoidance, Transfer, Abatement, Retention, and What are the characteristics of a good estimator? - Correct answer Visualization Skills, Technical abilities, Detailed numbers skills, Knows contract documents, Knows construction techniques, Familiar with job conditions, construction products, and purchasing, Creative, Detail-oriented, Follows instructions explicitly, Meets deadlines and works under pressure, Perfectionist, and Organization skills Why are CSI Master Format important in our industry? - Correct answer Fosters clearer communication among designers and builders and all the other project players and makes it much easier to meet the owner's requirements for time, budget, and quality Lead time is the amount of time it takes for a products or equipment to be delivered to the job site. - Correct answer True Name the four primary categories of direct costs in the construction estimate. - Correct answer Subcontract Costs, Labor Costs, Material Costs, Equipment Costs What are some examples of indirect costs? - Correct answer Supervision, Job trailer expense, Temporary utilities, Testing and inspections, Job photographs, Safety supplies, Chemical toilets, Security fencing and barricades, Trash and debris removal, Cleanup, and Bonds and insurance The benefit of a cost model is to guide design. - Correct answer True Construction estimates are typically organized by construction specification institute division of work. - Correct answer True Conceptual estimating through the design process can ensure that the completed design is in line with the budget. - Correct answer True Who should perform the constructability review? - Correct answer Project managers, Senior personnel within the construction company, Superintendents, Foremen, Trades personnel, Subcontractors, Facility and maintenance personnel, and Specialty contractors How do feasibility studies benefit the owner? - Correct answer Help the owner at an early stage consider how successful the project will be for its intended purpose. The construction manager will help the owner uncover both the positive and negative outcomes of the project before they proceed with the investment and capital expenditure What would be included in a feasibility study for a new elementary school? - Correct answer Environmental Impacts, Traffic and parking issues List the most common preconstruction services. - Correct answer Value Engineering, Target Value Design, Constructability Reviews, and Life-Cycle Analysis Preconstruction services is the process that represents the front-end planning, cost estimation, and execution planning for a construction project that gets the project to ________. - Correct answer START The notice to proceed is the document issues by the owner authorizing the contractor to start _____________. - Correct answer CONSTRUCTION What marks the official end of the project? - Correct answer Substantial Completion Who are the key members of the project team? - Correct answer General Contractor/CM, Owner, and Design Team Name some positions that make up the members of the on-site construction management team. - Correct answer Project Manager, Superintendent, Assistant Superintendent, Field Engineer What is included in the Project Close-Out? - Correct answer Substantial Completion, Final Completion, Certificate of Occupancy, Project Punch lists What are some things the AHJ is responsible for? - Correct answer Administering Building Codes, Issuing Certificates of Occupancy, Issuing Building Permits, Inspections for Compliance What are the stages of the design process? - Correct answer Programming/Feasibility, Design Development, Construction Documents, Schematic Design It's not __________ until somebody __________ it. - Correct answer ARCHITECTURE, BUILDS What is a means of contractor receiving clarification from the architect regarding details of the design after the contract documents have been published and a guaranteed maximum price executed? - Correct answer Request for Information responses What is the purpose of a submittal? - Correct answer Product sample, Product literature, Product data, Color Options The purpose of shop drawings is to supplement the contract documents. - Correct answer True What is the name of the document that establishes the template for measuring work progress as it relates to requests for payment? - Correct answer Schedule of Values Liquidated damages are the daily amount of time paid by the contractor to the owner for each day that the project fails to meet the completion dated specified in the contract. - Correct answer False Liquidated damages are assessed in lieu of actual damages. - Correct answer True What is retain age? - Correct answer a percentage established in the contract to withhold from progress payments A site logistics plan should include: - Correct answer Material Storage Zones, Location of temporary field offices, Location of temporary measures, Security Measures for Construction, Location of the field office, Location of the temporary utilities, Location of the storage trailers,
Docsity logo



Copyright © 2024 Ladybird Srl - Via Leonardo da Vinci 16, 10126, Torino, Italy - VAT 10816460017 - All rights reserved