Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

DBIA - Principles of Design-Build and Post Award Questions with Answers., Exams of Nursing

DBIA - Principles of Design-Build and Post Award Questions with Answers.

Typology: Exams

2022/2023

Available from 07/27/2023

DoctorMark
DoctorMark 🇺🇸

3.8

(15)

1.1K documents

1 / 10

Toggle sidebar

Related documents


Partial preview of the text

Download DBIA - Principles of Design-Build and Post Award Questions with Answers. and more Exams Nursing in PDF only on Docsity! DBIA - Principles of Design-Build and Post Award Questions with Answers. Co-location - Correct Answer The term used to describe the situation where the designers and contractors are placed in close proximity to one another, often in the same office or jobsite trailer. Design Reconciliation - Correct Answer The process of managing the design to a set of pre-determined "targets" ADePT - Correct Answer Technology to assess design value. Request for Proposals - Correct Answer Document the describes the procurement process, forms the basis for final proposals an becomes an element of the contract. RFP, Technical Proposal, Price Proposal - Correct Answer Three documents that initially govern the DB agreement in the best value competition. DBIA - Principles of Design-Build and Post Award Questions with Answers. Controlling Party - Correct Answer The party holding the prime contract position in a multiple firm DB contractual relationship. 35% - Correct Answer Design Build RFP's will be evaluated off of less than what percentage for qualifications based evaluation. Negotiate - Correct Answer What the DB'er now has the right to do after award of contract. Honorarium - Correct Answer A stated amount sometimes paid to unsuccessful proposers in consideration of preparing a Design-Build Proposal. Spearin Doctrine - Correct Answer The owner warrants the sufficiency of the plans and specs to the contractor under this regulation. DBIA - Principles of Design-Build and Post Award Questions with Answers. Committed Design - Correct Answer Occurs when the design component has been priced and confirmed "within budget" and when the drawings and specs are approved by the Designer on record as complying with the RFP. Trend Management - Correct Answer 1 - Facilitate decisions to keep the estimate from increasing budget. 2 - Encouraging proactive approaches to resolve changes quickly with the owner. 3 - Tracking & Documenting cost fluctuations between milestone estimates. 4 - Mitigating disputes before they get larger. Design Stability - Correct Answer When the design is completed enough such that accurate cost estimates can be determined. DBIA - Principles of Design-Build and Post Award Questions with Answers. Joint Risk Assessment - Correct Answer A multi-disciplined comprehensive risk identification, evaluation and analysis session that involves representatives from the entire design build team. Performance Incentives - Correct Answer Award Fees, Shared Shavings, Target Cost Contracts, Alliance Contracts. Alliance Contract - Correct Answer Cooperative Contracting model that is characterized by collaboration and aligning values, goals and objectives amongst owner, architect and contractor. Shares Risk among all participants. Award Fee - Correct Answer Incentive mechanism for target cost contracts that triggers a financial reward when the DB'er meets or exceeds certain performance standards. Typically for non-cost related performance items: safety, schedule, communication, customer satisfaction. DBIA - Principles of Design-Build and Post Award Questions with Answers. RFP should include: - Correct Answer 1 - ID MWEBE Goals 2 - Expected Substantial Completion Date 3 -Weighted proposal selection criteria 4 - Performance Requirements Performance Specs should include: - Correct Answer 1 - Statement of desired results 2 - Attributes or Characteristics of a facility Element 3 - Measurable or observable definitions of performance 4 - Testing requirements to validate performance Equivalent Design/Low Bid AKA BAFO - Correct Answer Form of Procurement where techinical proposals are critiqued not scored and the proposer revises design and is then judged off of low bid. Best Value Procurement Examples - Correct Answer 1 - Fixed Price/Best Design
Docsity logo



Copyright © 2024 Ladybird Srl - Via Leonardo da Vinci 16, 10126, Torino, Italy - VAT 10816460017 - All rights reserved