Download Construction Project Management Terms: Design-Bid-Build, Design-Build, CM, Fast Track, Con and more Quizzes Structures and Materials in PDF only on Docsity! TERM 1 Design Bid Build DEFINITION 1 Sequential, single or multiple prime, completed design handed off to contractor, low bid process. TERM 2 Design Build DEFINITION 2 Arch/Eng/GC brought on board from start. Design not complete when construction begins. Fast Track. TERM 3 CM DEFINITION 3 Owner employs CM to oversee project. May be Fast Track also TERM 4 Fast Track DEFINITION 4 GC usually brought on board early, documents are issued as needed to subcontract work TERM 5 Project Manual DEFINITION 5 Contains all Written Requirements For the project Drawings. a. Concept & Contents b. Follow CSI Master-Format c. Bidding Requirements d. Contracting Requirements/forms/conditions e. Specifications TERM 6 Design Team DEFINITION 6 Architect/Engineer/GC Determine: Legal, Financial, Program & Design Project, Contract Documents Contract Administration, Negotiation Coordination TERM 7 Drawings DEFINITION 7 a. Graphic & Quantitative form b. Extent/scope c. Design d. Location e. Relationship f. Dimensions TERM 8 Specifications DEFINITION 8 Specifications are Written Requirements For The building Div 1-16 TERM 9 Contractor DEFINITION 9 responsibility include: -Prepare takeoffs to determine costs -Ensure that all subcontractors are bidding in accordance with the specifications -All bids cover the entire scope of the project - Obtain all information available from the design team -Ask questions if something is unclear; ie. scope -Avenues for communication with the design team ---Request for Information (RFI) ---Document clarification/Verification request (DCVR) TERM 10 Contractors Perspectives in the Construction Proses DEFINITION 10 Perspectives include 1)Obtain the product data, shop drawings, test reports, and samples of materials to be used on the project. 2)Send the submittals to the design team for review and approval 3)Order long lead items; ie. structural steel