Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Engineering Economy – Redevelopment Project Solution | ISYE 6225, Study Guides, Projects, Research of Systems Engineering

Material Type: Project; Class: Engineering Economy; Subject: Industrial & Systems Engr; University: Georgia Institute of Technology-Main Campus; Term: Unknown 2003;

Typology: Study Guides, Projects, Research

Pre 2010

Uploaded on 08/18/2009

koofers-user-62l
koofers-user-62l 🇺🇸

10 documents

1 / 1

Toggle sidebar

Related documents


Partial preview of the text

Download Engineering Economy – Redevelopment Project Solution | ISYE 6225 and more Study Guides, Projects, Research Systems Engineering in PDF only on Docsity! Redevelopment Project Solution 0 1 2 3 4 5 12.50 18.75 28.13 42.19 63.28 94.92 8.33 12.50 18.75 28.13 42.19 5.56 8.33 12.50 18.75 3.70 5.56 8.33 Project Value Event Tree Without Options 2.47 3.70 1.65 Capital Investment 10.00 11.00 12.10 13.31 14.64 16.11 Maintenance Cost 0.50 0.50 0.50 0.50 0.50 0 1 2 3 4 5 4.12 8.41 16.03 28.88 48.64 78.81 1.47 3.06 6.43 13.49 26.08 1.20 1.20 1.27 2.64 1.20 1.20 1.20 Project NPV Event Tree With Options 1.20 1.20 1.20 The numbers in bold signify the development project should be undertaken. Since the developer could begin development today for an NPV of 2.5 million, and since the value of the development when the delay option exists is 4.12 million, the developer would be willing to pay up to 1.62 million to acquire these options.
Docsity logo



Copyright © 2024 Ladybird Srl - Via Leonardo da Vinci 16, 10126, Torino, Italy - VAT 10816460017 - All rights reserved