Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Intermediate Rigging Exam Prep Questions & Answers., Exams of Public Health

Intermediate Rigging Exam Prep Questions & Answers.

Typology: Exams

2023/2024

Available from 04/26/2024

Advancewrighter
Advancewrighter 🇺🇸

4

(10)

3K documents

1 / 4

Toggle sidebar

Related documents


Partial preview of the text

Download Intermediate Rigging Exam Prep Questions & Answers. and more Exams Public Health in PDF only on Docsity! Intermediate Rigging Exam Prep Questions & Answers.  What is the distance from a compacted soil - Correct answer 1.5 ×depth?  What is the distance from compacted soil - Correct answer 1×depth?  How far past tracks must mats be - Correct answer 2'  Name 2 methods for cribbing - Correct answer 1) area of float ×3= blocking area  2) Crane capacity ÷5= blocking area  How level must cranes be - Correct answer 1% or .57°  What is the formula for leverage - Correct answer Weight × distance = weight × distance  How far must you type off the crane - Correct answer 2' from the counter weights?  What is the wind speed that stops hoisting operations - Correct answer 25-30 MPH?  At what speed do you stop hoisting personnel - Correct answer 20 MPH  When is side loading okay - Correct answer only with a freely suspended load  What is effective weight - Correct answer everything below the boom tip  Who must sign off on new signals - Correct answer the operator, signal person, lift director?  What is the best tag line to use for work near power lines - Correct answer Polypropylene?  What does it mean when you have localized narrowing of outside diameter of wire rope - Correct answer Broken core  What is RRL - Correct answer Right regular lay  What is EIPS - Correct answer Extra improved plow steel?  What is IWRC - Correct answer Independent wire rope core?  What percentage of diameter can wire rope not go below - Correct answer 95%?  Gross capacity is the same as - Correct answer Allowable line pull P a g e 1 | 4  Gross capacity- deductions equals - Correct answer Net capacity  What is the capacity for crane on outriggers, tire, track - Correct answer Outriggers= 85%  Tires=75%  Tracks=75%  What does everything above the bold line on a load chat mean - Correct answer more likely to break?  What does everything below the bold line on a load chat mean - Correct answer more likely to tip over?  What is the safety factor for slings - Correct answer 5?  What is the safety factor for chains - Correct answer 4?  What grade must the steel chain be for lifting operations - Correct answer 8/ 80/ 800?  How many broken wires are required to make a standard running rope unusable - Correct answer 3 per strand per lay, 6 random per lay  How many broken wires are required to make a rotation resistant running rope unusable - Correct answer 2 per strand per 6 rope diameters, 4 per strand per 30 rope diameters?  How many broken wires are required to make a standing rope at end fittings unusable - Correct answer 1?  How many broken wires are required to make a standing rope at mid area unusable - Correct answer 2?  How many broken wires are required to make a wire rope sling unusable - Correct answer 5 per strand per lay, 10 random per lay  What is the sling stress for 90° - Correct answer 1.000?  What is the sling stress for 60° - Correct answer 1.155?  What is the sling stress for 45° - Correct answer 1.414?  What is the sling stress for 30° - Correct answer 2.000?  What is the sling stress for 5° - Correct answer 11.490?  What is ANSI standard for hook twist opening and wear - Correct answer Twist 0°  Opening 5% P a g e 2 | 4
Docsity logo



Copyright © 2024 Ladybird Srl - Via Leonardo da Vinci 16, 10126, Torino, Italy - VAT 10816460017 - All rights reserved