Download Projects Proposals 2008-2012 Part 1 -Computer Science-Project Proposals and more Study Guides, Projects, Research Computer Science in PDF only on Docsity! Page 1 of 2 Department of Computer and Information Sciences Project Proposal Proforma Project Title: UltraSound evaluation of the fibrosis stage in chronic liver Name of Organization/Industry (if any): _______PIEAS___________ Department/Division: DCIS___ Expected Cost (if any): ______________________________________Work Place: PIEAS Theoretical/Experimental/Computational Field: Information system/Networking/Signal & Image Processing Pre-requisites: Linear Algebra, Signals and Systems, Fundamental of Image Processing Deliverables: Software Package Synopsis (Attach separate page if required) The work will be based on research in the field of image processing particularly study of the existing techniques and algorithms for determining fibrosis stage in chronic liver. The application is to investigate the fibrosis stage in liver to offer individualize health care. Observing different feature extraction and classification techniques to access the accuracy of ultrasonography in diagnosing compensated liver cirrhosis in daily clinical practice outside the context of clinical trials will be presented in this study. Academic Learning 1. Understanding of Liver images data 2. Matlab Understanding 3. Feature extraction Techniques 4. Classification techniques 5. Optimization 6. Report and thesis writing Work Breakdown Structure 6th Literature survey, research paper reading and understanding, Effective of use of Matlab, Fundamental of image processing. Sem (1 CH) Proposal 7th Implementation of feature extraction and classification techniques to access the accuracy of fibrosis stages in liver images. Sem (3 CH) Midterm (Analysis) Final (Design) 8th Implementation of improved techniques, analysis of the results a comparison of the results with other researcher, Research paper writing. Thesis writing at the end Sem (9 CH) Midterm (Implementation) Final (Demo & Thesis) Instructions All the fields of project proposal forms are mandatory to be filled. The minimum qualification for a supervisor is sixteen years of education plus two years service. The minimum requirement for a co-supervisor is sixteen years of education. In case of external supervisor (outside DCIS), a co-supervisor will be mandatory from faculty and his role will be as a coordinator (no technical help). Wherever the project work is carried out (including classified establishments), the demonstration (only examiners and supervisor) and final presentation (open to all) will be held at PIEAS. The presence of supervisor is necessary for following presentations: 6th Sem, 7th Sem Final and 8th DCIS has right to reject or accept any project. Sem Final. Sent By: Signature of Supervisor:___________________________________ Name & Designation:___Abdul Jalil, Pr. Scientist :_____92-51=2208355____ : _______92-51=2208070__ :_____ 92-300-8541191___ : _____________________ Signature of Head of Organization/Department: _________________ Name & Designation:_________Abdul Jalil, Principal Scientist____ Sent To: Dr. Sufi Tabassam Gul (Project Coordinator, DCIS) : 051-2207380-4 (Ext: 3207) : 051-2208070 : PAKISTAN ATOMIC ENERGY COMMISSION
Bannz Institute of Nuclear Medicine Oncology & Radiotherapy
(BINOR) cancer hospital-BANNU
hone: 0928-633611
ax: 0928-633611
‘a. Binor-Admin (6/2010 Dated:~10-03-2011
Subject: - PROJECTS FOR UNDERG 2ADUATE FELLOWS OF DCIS
With reference to the Fax Message with the subject underlined above dated
March 2, 2011, {wo project proposals has heen prepared and attached herewni. 7 sate.
BINOR cancer hospital is in the final phase of i's development and newwerking off
the hospital is alse in pipeline. After completion of the proposed projects a fellow may
then be offered a relevant post in BINOR establishment.
2. Subinitted for perusal please.
wor
Dr. Mohammad Anees _
Project Director, BINOR.
Medical Sciences
Diary No...& S4lfan,
Date: LEZ RBrder fon
BINOR cancer hospital Opposite to Khalifa Gul Nawaz General hospital,
Bannu Township, BANNU.
“AN
we 180
awe APS
PAKISTAN ATOMIC ENERGY COMMISSION
DIRECTORATE OF SCIENTIFIC DEVELOPMENT
P. O. BOX NO. 3132
ISLAMABAD
Phone: 9213051
Fax : 9213051
Ref: DSD/Estt-2(99)/2001 Lig al Dated: -03-2011
OFFICE MEMORANDUM
Subject: - PROJECTS FOR UNDERGRADUATE FELLOWS OF DCIS
Please refer to PIEAS Fax No. Nil dated 02-03-2011 on the subject cited
above and to enclose project proposal for undergraduate fellows of BS-CIS for the .
session 2008-2012 as desired please. ‘
(Mrs. S. Shadab Kamal)
Director(DSD)
J
Director(HRD)
PAEC
Islamabad
Ce:-
Dr. Abdul Jalil
Head(DCIS)
PIEAS
Project Title:
Project Executant:
Pruject’s Focal Person:
Project Supervisor:
Project Developer Team:
Project Duration:
Project Budget:
Project Beneficiaries:
Key Areas of Automation:
DSD Digitization: Creating a Paper-less Environment
Computer Services Group (DSD)
Mr. Gulfam Khan, DCS, Head(CSG)
Dr. Naveed Riaz, SS (CSG)
Faizullah Khan , SS (CSG)
Sarfraz Ahmad, SS, (CSG)
Student 1,2 (PIEAS)
12-18 months
Un-identified (Utilization of existing resources assuined)
Scientists and Staff Members of DSD
Transport Management System
Accounts Management System
Store Management System
Library Management System
Administrational activities
Team Management activities
Project Description:
DSD is currently working in a semi-automated environment. We intend to completely automate our
environment which will provide us benefits like minimum paper work, improved response timings. and
fast information dissemination.
In the first step we would automate the transport management system, which will include complete record
df official vehicles as well as the accessories, matntenance and mileage record. Moreover, we also
propose an integrated static vehicle tracking and online transport request system,
DSD's Accounts department is already computerized, but it can be improved further by making it
available online and allowing restricted access to the said system to the scientists and engineers of DSD
Similarly the Library and Store department are also partially automated and have the scope of further
improvement by making these available online with the addition of a separate module for online books
and items request and reports.
Furthermore, as DSD consists of several groups and group members who work together on same or
similar projects, so a module for Project management is also proposed where the respective Group Heads
of different groups can keep track of their group activities and provide guidance to their group members.
Moreover, provision of support of documentation of ongoing activities is also proposed. (One key
component of this module will be a centralized repository (Storage System) where code and data can be
shared between the team members.
Several functions of the administration office can also be computerized [ike an online leave applic
system which will cut out the physical movements and enable the group heads to have a bird’s eye
ign
view of the leave situation in DSD, keep track of individuals’ leave record and make approval
decisions.
Project Goal:
To computerize and integrate all departments and functions across DSD onto a single computer system
Project Objectives:
]
2,
3.
4.
5.
6
To switch from paper-based environment to more paper-less environment
To reduce costs in locating records and easier and up-to date retrieval of information.
To facilitate functions of all sub-departments of DSD.
To facilitate Group Heads with decision making based on on-line reports.
To coordinate the activities of all department of DSD.
To have an ideal flow of work without any bottleneck.
Project Issues:
1.
Going paperless means vulnerability to unauthorized third party access or worse, data !css. Thus.
we will seek a seamless security solution that will remove such doubts and fears . It will be
clearly defined that who can see specific documents based on user groups or individual users and
solution will limit availability of document and management tools by requiring authorization.
i
:
i
|
PAGE Az
asso we
Pabradan Institute of bragimvcminag ond! Oipdiacd Tatences 4
"ilo, Gilemabad, 95030 Pakistan
Department of Computer lormati i
Project Proposal Proforma
Project Tue; TO DEVELOP INFORMATION SYSTEM SPECIALIZED FOR CANCER CENTRES
Name of Orgsnization/industry (il any: DTG Department/Division: FOYT.
Expected Cost (if any):
: 2 . Work Place: _ SST 727 179 f
Natare: Theorecieal/ExpenshentalCommpurationsy Fick: Informatjsa systerVNetworking/Signal & Image Processing
re-requisites:,
Detiversbies;
2
Synopsis (Attach separate page if required}
“To develop 2 Hospital Information System in which different data bases aré
_-.._-oigated containing all the information related to cancer patients including scans.
wore eports.ctc for further treatmen:plan consultation and.future reference which
could fusher bc-caancctedcomotely-te-other cancer hospitals,
Academic Learning .
t L tacbe. 2 Visual Basic 5 Data Bor
4 5 6. sect Fe paca bi
Work Breakdown Structure
[ 6" Sem (PCH) Lie 2. * Ts 7
| Propasas i, 5. Te. |
a8 sem cH) LE 2. 3. ~|
| Midterm (Amatyss) 14. 3. LS.
i Finat (Desi) 7 3. “T5.
8" sem (9CH) LL 2. 3.
Midterm (Implemensation} | 4, 5. 16.
|" Finst emo g-Thesis) 17, 3. TS. J
Instructions
% All the fields of project proposal forms are manc atory to be tilted.
> The minknunt qualitication for a supervisor '$ siitosn years of.education plus two years service.
> The minimum requirement for a co-cupervisor is sixtecn years of education, | .
> tn case of external supervisor (outnide DCIS), 9 co-supervisor will be mandatory from: facuity and his role wilt
be as a coordinates (po tecbalea? belp). : .
> Wherever the project work is carried out (including classified establishments), the demonstration (onty
oxaminets and supervisor) and final presentation (open to i!) will bc held at PIEAS. ‘The presence of supervisor
is necessary for following presentations: 6° Bem, 7” Sem Final and &* Sera Fira.
> DCIS has right 10 reject or accept any project. Y
Sent By: >
Sig of Supervisor:
Name & Designation:
Seat To:
Dy, Sufi Tabassum Gul (Project Coordinator. CIS)
A Bs 05 1+220738004 (Ext: 3207)
Lob 8 951-2208070
4 oe, SB: Zi yliae fj TE: faci BPvieesede.nk
ogengccdipe OE Cox, pines @vieasedark
Signature of Head of Organization/Deparoncnt;
Name & Designation: _ ny is Sa /
Pakistan Inethute of Engineering and Applied Scionces, Nilore, Istamabad, Pakistan. 45650
(el) +#92-54-2207 380-4, (Fox) ++ 92-51-2208070
eee eOLd Laidig 951320498
PAE KG PAGE a2
eugene
Pakioton Trshitule sf Sngisesaing aud plied CWinces
oNVifor, Lilamuabad, ¢5650 Pakistan 4
> / zg
Department of Computer and Information Sciences
Project Proposal Proforma
Project Time: IMAGE PROCESSING & ANALYSIS OF ULTRASOUND IMAGES 1
Name of Organization/Agdustry (if any): EMM O jem. Departmenv/D! 2 [a foc? Lat r7 /
Expected Cost (i any): a Wok Plo “ a7
Natore: Theoretical pepfrentalicompuration| Fick: Information mt i i
Pee rte i nforma $yStem/Networking/Signal & Teg Pteessing
Detiveradies:
Synopsis (Attach separate page if required)
. . iqux ‘ oa it
—n—_—__tesclution,-conwast-&-brightnc: sof ulsrasound.imagesto cnhanccthe image.
+ —-qualis-for-the radieleaistte-borieidentifiestion-ofdisease-
Acadeinic Learning .
Cre } A Cem)
1 tt 2 Mad: 3 £2
4. _ 5. 6. “fa
Work Breakdown Struct 7 :
[e¥senqrcey Lh z. : 13.
‘Proposd 4 5. 6,
to Sem(3cH) Lh. 2. 3.
Midterm (analysss) C4. 5. [6
PB Oeig) OT & tS.
Te Semocey LL 2. x
| Midtena (Inipierogamation)| 4. —} &. }
: 1 Deme & Thesis) 7, [s 3. }
Instructions
> Allthe fitlds of project proposal forms are mank atory to be Stled.
> Gualification for a supervisor i$ Sixteen years of education plus two years service,
> The minimum requirement for a co-supervisor is. sixteen years of education,
> In ease of external supecviser (outside OCIS), a CO-supervisor wil! be mandatory fom faculty and his role wilt
be a8 8 Coordinator (oo technical belp). :
> Wherever the project work is onried out Gnoluding classified establishments), the demonstration (only
examiners and supervisor) and final presentation (open to afl) will be held at PIEAS. The presence of supervisor
is necessary for following presentations! 6° Sem, 7 Sera Final and 8° Sem Pinal,
> DCIS has right to reject or ascent any project.
Ww
Sept By: x wr Seat To:
Signature of Supervisers_ Dy, Sufi Tabassum Gu! (Projet Coordinator, DCIS)
Name & Designation: i a ten. at EX Wz 051-2207380-4 (Ext: 3207)
\
BiabIl-GIAD : &: 053+2208070
- (3 By Ligases Pah SaTs@ciasedack,
As Coa Missla@ricnseda. pk
Signature of Head of Oxganization/Department: p>
ne
Name & Designasior
Pakistan Ingttute of Engineering and Applied Sciences, Nilore, isiamabad, Pakistan, 48650
Tel} +492-51-2207 380-4, (Fax) ++ 92-51-2208070
agiiie ca