Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Milestone Summary for Proposed 3M Library Control System, Study notes of Introduction to Business Management

A detailed two-page milestone summary for the development of a library control system by a team of students. The summary outlines the phases and milestones of the project, including investigation, database design, and development of various modules such as administration, resource tracking, check-in/check-out, report generation, online help, and additional functionality. The team conducted prototype testing, system plan presentation, and received feedback and approval at various stages.

Typology: Study notes

Pre 2010

Uploaded on 08/26/2009

koofers-user-ous
koofers-user-ous 🇺🇸

5

(3)

10 documents

Partial preview of the text

Download Milestone Summary for Proposed 3M Library Control System and more Study notes Introduction to Business Management in PDF only on Docsity! Teacher’s Note: This two-page example of a milestone summary is good for class because the detail provided for each phase indicates what each phase entails. Note that the team has two preliminary phases. Phase 1 is investigation of system-wide issues and Phase 2 is the design of the database. After Phase 2 the team split into pairs. One pair worked on a specific user function for Phases 3, 5, and 7 while the other pair worked simultaneously on user functions for Phases 4, 6 and 8. This was a Delivery 1 milestone summary created by Kiet Tran, Grant Mordecai, Clint Cagle, and Jerome Nolte. NOTE: One-page milestone summaries with fewer phase-by-phase details are better for clients. Proposed 3M Library Control System: Major Milestone Summary Phases and Milestones Week Ending Date Phase 1: Preliminary Investigation Conduct Project Information and Specification Meeting Analyze System Objectives, Constraints, and Scope Analyze Available Resources, Costs, Benefits, and Feasibility Week 1 March 2 Determine System Procedures and Process Flow Prepare Diagrams of Proposed System Prepare Requirements Proposal - Hardware and Software needed Review with IT and Gail Approval - System Architecture - Required Infrastructure (hardware) - Suggested Platform (software) Week 2 March 9 Produce Delivery 1 Documentation Design System Menu Hierarchy Analyze 3M PowerBuilder Class Library Week 3 March 16 Construct Prototype Present Prototype and System Plan - Receive feedback and Approval Revise System Plan and User Interface Week 4 March 23 Phase 2: Design System Database Analyze Data Storage Requirements Analyze Data Retrieval Requirements - Multi-User Access - Record Locking Techniques - Data Integrity Analyze Current Employee Data Storage - SAM managed employee data Design Table Structures for Database Construct Entity Relationship Model Construct Test Tables using WatCom DB Client Validation of ER Diagram Week 5 March 30
Docsity logo



Copyright © 2024 Ladybird Srl - Via Leonardo da Vinci 16, 10126, Torino, Italy - VAT 10816460017 - All rights reserved