Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Sample Template for project proposal bidding, Summaries of Engineering management

Sample Template for project proposal bidding

Typology: Summaries

2022/2023

Available from 05/15/2023

dave-jamoles
dave-jamoles 🇵🇭

4 documents

Partial preview of the text

Download Sample Template for project proposal bidding and more Summaries Engineering management in PDF only on Docsity! OWNER: JOYGRACE DIAZ-VALENDEZ PROJECT TITLE: SECOND FLOOR EXTENSION LOCATION: DC2 REGENT PEARL SUBD. ALIJIS BACOLOD CITY PERSPECTIVE VIEW ESTIMATED COST OF LABOR AND MATERIALS ITEM DESCRIPTION QTY UNIT PRICE TOTAL I Mobilization 1 PHP 20,000.00 PHP 20,000.00 II SAFETY A. Personnel Protective Equipment 1 PHP 5,000.00 PHP 5,000.00 III PREPARAION WORKS A. Demolition/Clearing 1 PHP 20,000.00 PHP 20,000.00 B. layout 1 PHP 5,000.00 PHP 5,000.00 IV CIVIL/ STRUCTURAL & MASONRY WORKS COLUMNS, BEAMS(4mx.30x.30) and SLABS (7.74CU. METER) CEMENT 120 PHP 285.00 PHP 34,200.00 SAND 1 PHP 12,000.00 PHP 12,000.00 GRAVEL 1 PHP 14,000.00 PHP 14,000.00 10MM DEF BARS 120 PHP 221.76 PHP 26,611.20 9MM DEF BARS 120 PHP 102.95 PHP 12,354.00 GI WIRE 10 PHP 120.00 PHP 1,200.00 2X3 C PURLINF 20 PHP 550.00 PHP 11,000.00 2X4 C PURLINS 20 PHP 700.00 PHP 14,000.00 PHENOLIC FORMWORK 16 PHP 1,530.00 PHP 24,480.00 WOOD 150 PHP 150.00 PHP 22,500.00 WELDING ROD 10 PHP 120.00 PHP 1,200.00 WELDING MASCHINE RENT 14 PHP 150.00 PHP 2,100.00 COM NAILS 1 PHP 1,200.00 PHP 1,200.00 LABOR COST 1 PHP 176,845.20 PHP 176,845.20 TOTAL COST PHP 353,690.40 V ROOFING AND FRAMING INSULATOR 2 PHP 2,200.00 PHP 4,400.00 9MM DEF BARS 10 PHP 102.95 PHP 1,029.50 GI WIRE 5 PHP 120.00 PHP 600.00 2X3 C PURLINS 10 PHP 550.00 PHP 5,500.00 2X4 C PURLINS 20 PHP 720.00 PHP 14,400.00 LONG SPAN 40 PHP 1,520.00 PHP 60,800.00 METAL SCREW 100 PHP 100.00 PHP 10,000.00 FASCIA AND GUTTER 3 PHP 2,500.00 PHP 7,500.00 WElDING ROD 10 PHP 120.00 PHP 1,200.00 WELDING MACHINE RENT 15 PHP 150.00 PHP 2,250.00 LABORCOST 1 PHP 107,679.50 PHP 107,679.50 TOTAL COST PHP 215,359.00 VI CEILING WORKS METAL PURRING 85 PHP 217.00 PHP 18,445.00 SCREWS 100 PHP 152.00 PHP 15,200.00 GI WIRE 5 PHP 153.00 PHP 765.00 REVITS 10 PHP 154.00 PHP 1,540.00 HARDIFLEX 10 PHP 156.00 PHP 1,560.00 LABOR COST 1 PHP 37,510.00 PHP 37,510.00 TOTAL COST PHP 75,020.00 CONTRACT AND AGREEMENT for the CONSTRUCTION of the Second Floor Extension KNOW ALL MEN BY THESE PRESENTS: This contract made and entered into this___day of _________________________,2023 by and between: The CONSTRUCTION of the Second Floor Extension which is located _______________________________________________________________________________________ ______________________________________________________________________________________, Duly represent by __________________________________________, of _______________________________________________________________________________________ _____________________________________________________________ referred to as the OWNER; -and- KFH BUILD of B32 LOT 29 Green Acres, Bacolod City, duly represented hereinafter referred to as the CONTRACTOR. WITNESSETH: WHEREAS, a thorough estimation and bidding was conducted on ____________________ for the CONSTRUCTION of the Second Floor Extension; WHEREAS, time is the essence of this contract; NOW, THEREFORE, for and in consideration of the foregoing premises and other hereinafter named, the parties agree as follows: I - SCOPE OF WORK THAT the CONTRACTOR shall in accordance with the provision of and subject to the condition contained in the documents. Hereof, with a provision that this construction activity belongs to the OWNER, and in consideration of the sum of money hereinafter stated shall fully and faithfully perform all labor, and perform labor and services necessary to complete the CONSTRUCTION of the Second Floor Extension as per plan specifications of the OWNER. The work consist of the following specific work item. II - TIME OF COMPLETION The work to be performed by the CONTRACTOR under this contract shall commence after ten (10) calendar days upon receipt and acceptance of the Notice to Proceed by the CONTRACTOR. The CONSTRUCTION of the Second Floor Extension shall be completed within Ninety days (90) calendar days including holidays but excluding Sundays and . Should the CONTRACTOR refuse or otherwise fail to complete,the work stipulated herein. III - THE CONTRACT SUM Payment shall be in accordance with the following conditions: A. Upon execution of the Contract, the Owner will obligate the necessary funds to pay the contract sum in accordance with the Contract. The Owner agrees to pay the Contractor for the full and faithful performance of the work pursuant to this Contract at a sum equal to the aggregate cost of the work, labor, materials and supplies done and furnished at the price and rates set forth in the Contractor’s proposal, said sum being _____________________________________________________________ (PhP_________________). B. Advance payment shall be 30% of the total project cost equivalent to______________________________________________________________________________. C. FIRST & PARTIAL BILLING: First & Partial Billing shall be equivalent to 30% of the total project cost or equivalent to ___________________________________________________. This amount shall be released upon Thirty Percent (30%) project completion or the completion of the following items; a) 2 ND floor beams and slabs frames b) 2 nd floor wall steel frames D. SECOND & PARTIAL BILLING: Second & Partial Billing shall be equivalent to 30% of the total project cost or equivalent to ___________________________________________________. This amount shall be released upon Sixty Percent (60%) project completion or the completion of the following items; a) Roofing b) Installation of tiles c) Primer painting d) Installation of terrace railings e) Installation of Doors panels f) Installation of glass works g) Installation of electrical system E. RETENTION: All payments made by the Owner to the Contractor shall be subjected to 10% retention. Retention money shall be released after Thirty (30) calendar days from the date of turn-over of the project. IV - GENERAL CONDITION A. All materials and consumables shall be supplied by the Contractor. Ordering of materials shall be taken progressively as the need arises. B. Excess materials, scraps, scaffolds, forms, tools, equipment and other temporary structures being delivered, installed, deployed, and constructed on site by the Contractor are properties of the Contractor. C. First day of construction shall be considered Seven (7) days after the receipt of the advance payment. D. Project Time extension shall be granted to the Contractor for the accumulated unworkable days due to force-majeure and other adversities beyond the control of the Contractor e.g. bad weather. Time extension shall be based on the actual unworkable days as indicated in the “Daily Record Sheets” or log book. E. Permits & Licenses-(Not included) The CONTRACTOR hereby guarantee the works stipulated in this contract and all the materials it will apply and use in the construction as well as workmanship of all its work under this contract and shall make good of its own account and/or its own expenses. V - CONTRACT SIGNING AND ACCEPTANCE Should any court action be instituted by the OWNER or CONTRACTOR arising from this contract, the parties hereby agree. IN WTNESS WHEREOF, the parties have hereunto set their hands this ______day of _______________________ at Bacolod City, Philippines. By: _______________________________________ _______________________________________ (OWNER) (CONTRACTOR/S) Signed in the presence of: 1. ______________________________ 2. _____________________________
Docsity logo



Copyright © 2024 Ladybird Srl - Via Leonardo da Vinci 16, 10126, Torino, Italy - VAT 10816460017 - All rights reserved