Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Construction Project Management Terms: Detailed Drawings to Subcontractor Quotes, Quizzes of Building Materials and Systems

This description includes various terms related to construction project management, such as detailed drawings, estimates, design models, value engineering, contract documents, technical specifications, and more. It covers topics like equipment costs, productivity, work breakdown structure, and estimating approaches.

Typology: Quizzes

2010/2011

Uploaded on 11/03/2011

dillmon
dillmon 🇺🇸

5

(1)

5 documents

1 / 10

Toggle sidebar

Related documents


Partial preview of the text

Download Construction Project Management Terms: Detailed Drawings to Subcontractor Quotes and more Quizzes Building Materials and Systems in PDF only on Docsity! TERM 1 Detailed Drawings DEFINITION 1 Visual Description of the real asset; 2-d representation TERM 2 Engineers Estimate DEFINITION 2 Detailed cost of every activity in work break down structure TERM 3 2D & 3D design models DEFINITION 3 Used for digital rendering, clash detection, could help to analyze cost and schedule information TERM 4 Value Engineering DEFINITION 4 Value engineering is a systematic method to improve the "value" of goods or products and services by using an examination of function. Hold quality and time steady but reduce costHold cost and time steady but increase qualityHold quality and cost steady but decrease time TERM 5 Contract Documents DEFINITION 5 Agreement, general conditions, drawings, specifications, agenda, change order TERM 6 General Conditions DEFINITION 6 Common stipulations about administration & Relationships. Adresses items such as Definitions:owner, A/E, contractor repsonsibilitiesTimePaymentChanges in workDisputes TERM 7 Supplementary Conditions DEFINITION 7 Aspects of administration/relationships unique to project.Addresses items such as:Additional instructionsuse of local roads and streetsclean upmandatory wage ratesliquidate damages TERM 8 Technical Specifications DEFINITION 8 A specification is an explicit set of requirements to be satisfied by a material, product, or service. or description of qualities and performencee.g. equipment TERM 9 Proposal Agreement Form DEFINITION 9 A proposal form establishes intent on the part of the contractor to enter into a contract with the owner to complete the work described in the bidding documents at the cost indicated in the proposalinformation includedprice schedulecontact durationduration between work beginning and receipt of notice of award TERM 10 Addenda DEFINITION 10 Design alterations and notifications in design change by the owner to all biding contractors TERM 21 IIT for Estimating Equipment costs DEFINITION 21 InsuranceInterestTaxes cost TERM 22 Equipment Overhead and Profit DEFINITION 22 e.g. supervisor time, mechanic time, risk, etc. TERM 23 LCY DEFINITION 23 loose cubic yards TERM 24 BCY DEFINITION 24 Bank cubic yards TERM 25 CCY DEFINITION 25 Compacted cubic yards TERM 26 Factors affecting quantity per cycle DEFINITION 26 the size of the equipment and the material being moved TERM 27 Factors affecting cycles per hour DEFINITION 27 speed of the equipment, type of soil, grade percentage. TERM 28 Equipment Productivity DEFINITION 28 Qty/Time: usually Qty/hour TERM 29 Rolling Resistance DEFINITION 29 Resistance to movement of a vehicle over the travel surface due to internal friction, tire flexing, and penetration of the vehicle in to the travel surface TERM 30 Grade Resistance DEFINITION 30 Is the component of vehicle weight that acts parallel to an inclined travel surface TERM 31 Effective Grade DEFINITION 31 % grade + RR Conversion TERM 32 Force Available DEFINITION 32 f(power,speed) TERM 33 Force Usable DEFINITION 33 f(traction, wt., on drivers) TERM 34 Work Breakdown Structure DEFINITION 34 A work breakdown structure in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. subdividing the work in to pieces or work packages TERM 35 Work Package DEFINITION 35 In project management, a work package is a subset of a project that can be assigned to a specific party for execution. Helps produce an overall strategic approach for the job
Docsity logo



Copyright © 2024 Ladybird Srl - Via Leonardo da Vinci 16, 10126, Torino, Italy - VAT 10816460017 - All rights reserved